Welcome to Union Trade Center

Breaking Barriers, Building Bridges – Union Trade Center

Cart

Your Cart is Empty

Back To Shop

Breaking Barriers, Building Bridges – Union Trade Center

Cart

Your Cart is Empty

Back To Shop

Category: Mechanical Parts & Fabrication Services

Mechanical Parts & Fabrication Services

Showing 17–20 of 20 results

  • TUBE:OIL RESISTANT SYNTHETIC RUBBER
    REINFORCEMENT: 4 HIGH TENSILE STEEL WIRE SPIRAL
    COVER: ABRASION AND WEATHER RESISTANT SYNTHETIC RUBBER
    APPLICATION: FOR HIGH PRESSURE HYDRAULIC SYSTEMS
    TEMPERATURE: -40℃ to +120℃

    Contact Us
  • Adopting high quality materials for precision manufacturing. Can meet the high quality requirements of customers. The materials, sizes, shapes and specifications of the products are customized according to customers’ needs.

    Contact Us
  • Three-phase EI lamination is made by the silicon steel strip. The model of three-phase EI lamination is from three-phase(20) to three-phase(100), and the hole size is from Φ4.5 to Φ14. The gap sizes o

    Contact Us
  • Precision:ABEC-1,ABEC-3
    Material:Chrome steel,stainless steel
    OEM service:Custom Bearing size,logo,packing
    Certifications:ISO9001 or IATF 16949
    Payment terms:T/T, L/C, D/A,D/P,Western Union
    Capacity:500,000pcs
    Delivery time:1 week for sample, 30-60days for mass production
    Packing details:rolled in VCI paper+plastic bag+carton

    Contact Us
Translate »

Cart

Your Cart is Empty

Back To Shop